Alpha GridContact
Menu
Cars charging at Tesla V4 Superchargers in a retail center parking lot

Bring Tesla Supercharging to your center.

Make your center a premium charging destination. Contracted rent, higher NOI and zero upfront cost.

Built with
  • TeslaTesla Supercharger network
  • CBRECommercial real estate partner

Put your center on the map. In every Tesla's navigation.

A lease on about a dozen stalls, usually an unused corner. Separately metered; we pay the power.

80,000+
Tesla Superchargers worldwide
99%+
Tesla network uptime
60M+
EVs on the road
A row of Tesla V4 Supercharger posts with their power cabinet
  • Attract new customers.

    Stores near a new Supercharger see 4% more visits and 5% more spending.

    Peer-reviewed study
  • Turn charging into shopping time.

    Give drivers time to visit your shops and restaurants. Nearly half buy something while they charge, about $40 on average.

    UC Davis study
  • Encourage repeat visits.

    Make convenient charging part of your customers' regular visits.

  • No charging business to run.

    Tesla will run the chargers and driver support. Drivers will call Tesla, not you. Your lease is with Alpha Grid.

You approve the final layout. We plan around your parking, access and tenant needs.

Lease income becomes property value.

Rent adds to NOI, and NOI sets what the center is worth.

$0upfront cost to you
Rentpaid to you every year
NOIrises by the same amount
≈ 14.3× your annual rent, added to property value
Cap rate
Illustrative. Multiple of annual rent at an assumed cap rate. Not an appraisal.

We carry the project cost. Rent paid under your lease.

Your side

  • Sign the lease
  • Approve the plans
  • Provide consents

Our side

  • Project capital
  • Permits
  • Construction
  • Power bill
  • Liability insurance
  • Maintenance
  • Tesla operations
  • Removal at lease end
Fixed monthly rent · long-term lease

If permits or power do not work out, we end the lease at no cost to you. Summary of our standard lease form; the signed lease governs.

  • What we need from you.

    Approve the area, access, consents and work plan. Agree parking closures and restoration before construction. You set the construction blackout dates for your busy season.

  • Opening and rent timing.

    Rent starts the day your site opens to drivers. Before you sign, the lease sets the diligence and permit periods.

From lease to ongoing operations.

  1. You approve

    Finalize the lease

    Agree on the charging area and lease terms.

  2. You approve

    Design and permits

    We coordinate drawings and approvals. You approve the plans.

  3. Construction

    We build the site after permits are issued.

  4. Power and testing

    We coordinate utility connection and commissioning.

  5. Open and operate

    Tesla will operate and maintain the chargers and support drivers.

In parallel: utility coordination and equipment procurement
Prefabricated Tesla Supercharger units being set in place on a parking lot
Prefabricated Tesla Supercharger units, set in place. Photo: Tesla

Join the Tesla Supercharger network. 3,300+ U.S. locations drivers already use.

Tesla Supercharger locations, U.S.
Source: U.S. DOE Alternative Fuels Data Center, November 2026

The hardware. Tesla V4 Supercharging.

V4 Supercharger post

Max output power
500 kW for passenger vehicles, 1.2 MW for Semi
Continuous current
615 A
Voltage range
0–1,000 VDC
Cable length
3 m
Communication
Open protocols, ISO 15118-2, OCPI capable
Payment terminal
Optional
Charging standards
NACS, CCS1, CCS2, GB/T, MCS

V4 cabinet

Max DC output
Up to 1,200 kW, shared by 8 posts
Output voltage (DC)
180–1,000 VDC
Cabinet-to-post cable
Up to 100 m
Efficiency
>96%
Cooling
High efficiency, low noise, no ventilation needed

Tesla's published specifications

Questions owners ask.

What properties fit?

Open-air retail centers and grocery-anchored plazas.

What do I get?

A fixed monthly rent for the life of the lease, not a share of charging revenue. Your offer sets the rent for each site.

Who owns and runs the chargers?

Alpha Grid owns them. Tesla will operate and maintain them. If a charger is down, drivers will call Tesla, not you.

What do I commit to first?

A non-binding MOU. Then a long-term lease that you and your counsel review.

Do you work with portfolios?

Yes. One offer and one lease form across your centers.

What happens when the lease ends?

We remove our chargers and above-ground equipment at our cost.

Send us an address. We return an offer.

You get a term sheet, a site plan and rent per stall.

Brokers: send us a property list.

Subject to site feasibility and a lease for each property.